Getting Started

Before getting into the detailed instructions for using Electrical Connectivity Diagrams, the following tutorial provides a step-by-step scenario demonstrating how to use key functionalities.
aprereq.gif (1223 bytes) Before starting this scenario, you should be familiar with the basic commands common to all workbenches. These are described in the Infrastructure User's Guide.
The main tasks proposed in this section are:

Entering the workbench
Placing Components
Routing Cables
Creating a zone
Defining a zone boundary
Saving Documents

All together, these tasks should take about 15 minutes to complete.