Multi-processes concern the
CATDMUUtility processes that are created as child processes for the
tessellation of documents when performing a File -> Open of a
CATProduct or when running the CATDMUUtility batch process using the -mp
option. This new feature
enables the management of possible coredumps and / or looping problems
during tessellation such that the impact is localized to the specific
document that cannot be tessellated; the state of a V5 session will no
longer be impacted by these problems and a CATDMUUtility batch process will
run to conclusion. A log file indicates which documents could not be
tessellated. |
||
You must have activated the variable Multi process visualization mode with local cache in the Product Structure options. See Product Visualization. | ||
|
|
|
Multiprocess parameters |
||
Maximum son processes |
||
The number of child processes is limited to 1. | ||
In the Maximum son processes
text-entry field, enter the maximum number of child CATDMUUtility processes
to be used during tessellation. By default, this option is valuated to 2. |
||
Timeout (minutes) |
||
In the Timeout (minutes)
text-entry field, enter the maximum time that a single tessellation process
will be allowed to loop before being aborted. By default, this option is valuated to 60. |
||
Log File Path |
||
In the Log File Path
text-entry field, enter the path of the log file of the tessellation
process or click the Browse icon
to choose a path via the File Browser.
|
||
|