|Follow the steps in this section to migrate your HACWS control workstations |from AIX 4.3.3 to AIX 5L 5.1.
|Before following the steps in this section, should: |
|For both control workstations, follow the instructions in Step 3: Perform control workstation BOS migration install to AIX 5L 5.1. This step should be done while the control |workstation is inactive (not providing control workstation services to the SP |system).
|For both control workstations, follow the instructions in Step 4: Install the runtime prerequisites. This step should be done while the control |workstation is inactive (not providing control workstation services to the SP |system).
|For both control workstations, follow the instructions in Step 5: Verify AIX levels. This step should be done while the control |workstation is inactive.
|For both control workstations, follow the instructions in Step 10: Verify the correct level of PAIDE. This step should be done while the control |workstation is inactive.
|Follow the instructions in Step 6: Review space requirements for NIM boot images.
|Follow the instructions in Step 7: Review space requirements for /spdata.
|Follow the instructions in Step 8: Create the required /spdata directories.
|Follow the instructions in Step 9: Copy the AIX LP images and other required AIX LPs and PTFs.
|Follow the instructions in Step 11: Obtain additional PSSP prerequisites.
|Follow the instructions in Step 12: Install (copy) the basic AIX (mksysb) image.
|Your migration to AIX 5L 5.1 is now complete. You should test |your HACWS configuration by performing a control workstation failover from the |primary control workstation to the backup control workstation, and then |failover from the backup control workstation back to the primary control |workstation. Perform additional failover testing as needed.
|At this point, refer back to High-level migration steps to determine the next step in your SP system migration |process.