Preparing a Rack Model
Before you begin
Read the documentation that comes with the rack enclosure for additional safety and operating
information.
The hard disk drives in Netfinity 5000 are hot-swappable.
If you are installing only a hard disk drive (bays 1 through 5), go directly to 'Internal Drives Installation or Removing'.
Otherwise, continue with the following steps.
NOTE: If you are in the United Kingdom, you must perform this step before disconnecting the power cord.
The Power-on switch on the front of the server does not turn off the electrical
current supplied to the server. The server also might have more than one power cord. To remove all electrical current
from the server, ensure that all power cords are disconnected from the power source.
NOTE: When the server is in the locked position, you can easily reach the cables on the back of the server.
1) Locate the blue bezel release lever on the top of the server, in the right front corner.
2) Move the lever toward the right, following the curve of the lever opening.
Please see the LEGAL - Trademark notice.
Option
Go to:
Adapters
Adapters
Memory modules
Memory Modules
Internal drives
Internal Drives Installation or Removing
Microprocessors
Microprocessors
Power supply
Power Supplies
External options
External Options
Security options
Security
Back to
Feel free - send a for any BUG on this page found - Thank you.