| Now that you have a conveyor system, create a conveyor network within the system. | ||
| 1. | Double-click the Conveyor System in the specification tree to make it active. | |
| 2. | Select the Logical Line button
|
|
| 3. | Select Conveyor Network as the type. | |
| 4. | Click OK.
The Conveyor Network is created. |
|
| 5. | In the specification tree, click on the plus sign (+) next to the Conveyor System to see the newly created conveyor network. | |
|
|
||