|
|
This step shows how to impose a synchronization between the two machining operations. | |
|
|
1. | Click Create Synchronization
|
| 2. | Select the External Roughing operation then the Drilling operation in the PPR tree. | |
| 3. | In the Synchronization Editor that appears, set the
synchronization position for the Upper Turret to Before retract
macro.
Click OK to confirm the synchronization. |
|
|
|
||