-
Select the Transmit/receive signal you just created in
the tree view.
-
Click the Assign View
button
.
The Assign view is displayed to the right of the tree view.
-
Click the small + sign to the left of items in
the Assign view to expand them and show their contents.
-
Select connector P7 and control-click connector P6 in the
top part of the Assign view.
-
Click Add to connect the control unit and
antenna via the Transmit/receive signal.
The connection is made and displayed in the bottom part of the Assign
view.
-
Click OK in the Assign view to validate the
connection.
The connection is made and two end points are
created under the signal. |
|
|