Specific products, resources, Manufacturing Assemblies and Manufacturing
Kits can be selected from projects that are saved in the Manufacturing Hub. This section describes this procedure. |
|
-
Open a process from the Manufacturing Hub.
-
Select Open Products, Resources,
Manufacturing Assemblies and Manufacturing Kit from Manufacturing Hub
in the Manufacturing Hub toolbar, or select Open Products,
Resources, Manufacturing Assemblies and Manufacturing Kit from the
Insert > Manufacturing Hub menu.
-
The PPR Hub - Select Product dialog box
prompts for the type of object to be imported (product, resource, manufacturing assembly
or manufacturing kit):
Note that only those object types that are currently available in the
open project will be shown in the drop-down list above. If, for example, there are no manufacturing assemblies
currently available in the project, Manufacturing Assembly will be omitted from the drop-down list.
-
After selecting the type of object to import, double-clicking each level of the
resulting hierarchy displays each available child level. Once the desired product, resource or manufacturing
assembly is located, click on it to highlight it and select OK.
-
Right-click an object in the browser window
to display a context menu containing a Properties command
which allows read-only access to the object's Extended
Properties Panel.
-
The Search button may also be used to
display the PPR Search dialog to search for an object based
on specific criteria. After selecting an object in the
Search Results and clicking the OK button, the selected
object will be highlighted in the Manufacturing Hub - Select
dialog.
-
After the OK button is clicked, the selected object is inserted into the current PPR:
Loaded Manufacturing Kits and Assemblies appear under the Applications node in the Manufacturing
Products folder as shown below. The parts and resources of the Kit are shown as children of the kit:
|
|
The Apply Volumetric Filter feature allows
you to specify a bounding box, boundary clearance and boundary operator
(i.e., Fully In, Fully Out, etc.,) to select products to load based on
volume.
-
Select Open Products, Resources,
Manufacturing Assemblies and Manufacturing Kit from Manufacturing Hub
.
-
In the PPR Hub - Select Product
dialog box, select the Apply Volumetric Filter checkbox:
The
button becomes enabled.
-
Select the loaded product and click
.
The current bounding box is displayed in the 3D viewer, and the
Specify Volume Filter Criteria dialog box is also displayed:
Modify the bounding box as needed and specify the desired
Boundary Operator and Boundary Clearance
accordingly in the Specify Volume Filter Criteria dialog.
Volume filters can be loaded and saved with the Load and
Save buttons as described in
Defining and applying filters.
-
Select OK.
Only those products that match the defined filter criteria are
loaded. In addition, the tooltip for the
button now displays the volume filter criteria that has been set.
After the volume filter criteria has been defined, the Apply
Volumetric Filter check box can be unchecked at any time so
that the filter is not applied.
Product and resource behavior
Products and resources inserted from the Manufacturing Hub are made flexible by default. For
details about flexible and rigid modes, please refer to Using Flexible Sub-Products in the DELMIA Product
Structure Users Guide for more information.
Product and resource data loaded in in DPM will be visualized at the
position specified in the Manufacturing Hub, and any modifications to the resource positions are saved back to the
Manufacturing Hub when the process is saved. This default behavior can be modified to convert the flexible assembly
to a rigid assembly via commands available in the product structure workbench. The flexible or rigid status of a
product or resource is saved in the detailing when the process is saved back to the Manufacturing Hub. |
|
- When a Manufacturing Kit is loaded, 3D states and positioned objects linked to any of its sub-components are
also loaded. However, any 3D state or position information linked to the Manufacturing Kit itself is not loaded.
- When loading a Manufacturing Assembly in DPM, Manufacturing
Assemblies defined as AST are not displayed in the browser.
- If data has been loaded in DPM using a resource-centric load
(Please see Process and Resource Definition User's Guide: Advanced Task:
resource-centric load),
attempting to load a resource with the Import Products, Resources,
Manufacturing Assemblies and Manufacturing Kit command, a warning
message will be displayed to note that the resource load will continue
without loading the processes associated to these resources.
-
A check box is provided in the
Manufacturing Hub – Select Resource dialog to opt for loading the behavior of the
chosen resource or not:
|